Skip to content Skip to footer

Mission Viejo – California 2

The project involved removing a load-bearing wall on the first floor of a two-story building to extend the living room space. The scope included a structural inspection, creation of detailed blueprints, and provision of necessary calculations. The wall was replaced with a header beam supported by two posts, ensuring compliance with building codes. The process included a thorough structural assessment, design and calculation of the new support elements, and verification of compliance with all relevant standards. This ensured the expanded living space maintained the building’s structural integrity.

Go to Top